Home

SPORTS
COMPLEX, MOHALI
The
details of the infrastructure to be build are :
1. INDOOR ARENA:
Output
Performance Parameters
User
Groups
Selected
and elite sports people for training and events Public as
spectators and for banquets and functions
Sport
Field of Play
Main
competition area of 44m X 44m to meet all sports
requirements
Height
13.5 m clear space
Field of
play can interchangeably accommodate handball (1),
volleyball (2), basketball (1), badminton (3), gymnastics
(full international layout), table tennis, wrestling,
boxing, weightlifting and similar sports
Change
room and players facilities flexibility to meet specific
sport needs
Air-conditioned environment controlled air flow for
badminton and table tennis
Seating
Seating
for 7500 spectators individual plastic bucket including
300 padded seats for VIPs.
2. HOCKEY STADIUM :
Output
Performance Parameters
User
Groups
Selected
and elite Hockey Players training and competition
Sport
Field of Play
International standard hockey pitch with synthetic surface
(unfilled water based synthetic grass on shock pad system)
with 7-10 year life cycle.
Specific
watering and drainage system.
Seating
Capacity
for 20000 spectators
VIP Box,
Press Box
Fully
covered stand with individual plastic bucket seats in S/W
stand including 1000 padded seats for VIPs
Additional Elements
Hostel
facilities for 200 beds (2 X 100 male and female) plus
offices
Provision
of space for storage of sports and related equipment.
3.
INDOOR AQUATICS CENTRE:
Output
Performance Parameters
User
Groups
Elite
training and competition
Public
Sport
Field of Play
One 75m X
25 m tank with moveable boom/bulk head (flexible design
allows different configurations) all international
standard.
Competition pool 50 m X 10 lanes X 2.1 m deep (swimming,
learn to swim, water play, water polo)
Diving
pool 25m X 25m X 5m deep (warm up for events, diving,
synchronized swimming, water polo, fitness)
Depth
adjustable floor 50m to allow for flexible use of pool for
learn to swim classes and water play
Full
diving platforms and spring boards (10m, 5m, 3m and 1m)
Change
room and athlete facilities for events and public
All
accredited filtration systems (Ozone) and non slip 6-10 m
surrounding decks
Air-Conditioned environment
Water
temperature 28 Degrees
4. OUTDOOR SPORTS FACILITIES:
Output
Performance Parameters
User
Groups
Public
and families
Sport
Field of Play
3 X
outdoor tennis courts hard-court plexipave, fenced, small
seating area (100)
4 X
outdoor badminton courts plexipave
1 X
basketball/multi use court plexipave
Seating
Small
allowance for tennis courts
Lighting
Low
levels for recreational use
Entry/Exit and Parking
Dedicated
entry and parking for public for use of outdoor facilities
and aquatics centre events would use entry and parking area
for VIPs
Additional Elements
Play
ground for families incorporated into the space
Aquatics
facility would manage the outdoor facilities and maintenance
Facilities Include
Three
Lawn Tennis Courts (Two Nos. Synthetic Courts, One Nos Clay
Court)
One
Skating Rink
Three
Badminton Courts
One
Basketball Court
Children
Swings and Play Area
6 A Side
Hockey Practice Pitch
Jogging
Track/Health Trail
PRELIMINARY COST
|
S.No. |
ITEM |
UNIT |
QUANTITY |
RATE |
AMOUNT
(in Rupees) |
|
ATHLETICS & FOOTBALL STADIUM |
|
|
|
|
|
1 |
RCC framed structure for the entire complex |
Sq. Mts. |
6,500 |
16,500 |
107,250,000 |
|
2 |
Tensile covering on the top tier Seating |
Sq. Mts. |
3,000 |
7,000 |
21,000,000 |
|
3 |
Synthetic athletics tracks |
LS |
1 |
70,000,000 |
70,000,000 |
|
4 |
Practice tracks |
LS |
1 |
4,000,000 |
4,000,000 |
|
5 |
Natural grass turf football field |
LS |
1 |
20,000,000 |
20,000,000 |
|
6 |
Plastic bucket seats |
per seat |
8,000 |
1,000 |
8,000,000 |
|
SUB TOTAL |
230,250,000 |
|
INDOOR AQUATIC FACILITIES |
|
|
|
|
|
7 |
RCC framed structure for the entire complex |
Sq. Mts. |
3,515 |
16,500 |
57,997,500 |
|
8 |
Pool space frame structure |
Sq. Mts. |
7,830 |
18,000 |
140,940,000 |
|
9 |
Area below seating RCC area |
Sq. Mts. |
2,060 |
14,000 |
28,840,000 |
|
10 |
Olympic size pool 78.0 X 25.0 Mts. Including
filtration plants, etc. |
LS |
1 |
360,000,000 |
360,000,000 |
|
11 |
False Floor/ and flexible Boom |
LS |
1 |
160,000,000 |
160,000,000 |
|
12 |
Cost of 4 int. squash courts, one glass wall and
movable side walls. |
LS |
1 |
16,000,000 |
16,000,000 |
|
13 |
Hydrotherapy pool |
LS |
1 |
40,000,000 |
40,000,000 |
|
14 |
Plastic bucket seats |
per seat |
2,000 |
1,000 |
2,000,000 |
|
SUB TOTAL |
805,777,500 |
|
INDOOR SPORTS STADIUM |
|
|
|
|
|
14 |
RCC framed structure for the entire complex |
Sq. Mts. |
3,500 |
16,500 |
57,750,000 |
|
15 |
Sports floor for the stadium area |
Sq. Mts. |
1,350 |
10,000 |
13,500,000 |
|
16 |
Plastic bucket seats |
per seat |
2,000 |
1,000 |
2,000,000 |
|
SUB TOTAL |
73,250,000 |
|
OPEN HOCKEY STADIUM |
|
|
|
|
|
17 |
RCC Framed Structure for the entire complex all
floors |
Sq. Mts. |
4,150 |
16,500 |
68,475,000 |
|
18 |
Hockey turf, unfilled water based, synthetic base
with drainage system top line |
LS |
1 |
40,000,000 |
40,000,000 |
|
19 |
Tensile covering on one side on top |
Sq. Mts. |
2,100 |
7,000 |
14,700,000 |
|
20 |
Plastic bucket seats |
per seat |
4,500 |
1,000 |
4,500,000 |
|
SUB TOTAL |
127,675,000 |
|
OUTDOOR ACTIVITIES AND OPEN AREAS |
|
|
|
|
|
21 |
3
No Tennis Courts, 4 Badminton Courts, 1 Basket Ball
Court, 1 Skating Rink |
Sq. Mts. |
4,350 |
4,000 |
17,400,000 |
|
22 |
Food Courts/Outdoor |
Sq. Mts. |
|
5,000 |
5,000,000 |
|
23 |
Cost of covering and re aligning the drain (Size
25.0 X 4.0 Mts.) |
Cu. Mts. |
30,000 |
8,000 |
240,000,000 |
|
24 |
Site development |
Sq. Mts. |
90,000 |
500 |
45,000,000 |
|
SUB TOTAL |
307,400,000 |
|
COMMERCIAL COMPLEX |
|
|
|
|
|
25 |
RCC Framed structure with basic finishes |
Sq. Mts. |
48,564 |
15,000 |
728,460,000 |
|
26 |
Basement area for parking |
Sq. Mts. |
19,430 |
14,000 |
272,020,000 |
|
SUB TOTAL |
1,000,480,000 |
|
ELECTRICAL |
|
|
|
|
|
1 |
Transformers |
|
|
|
25,000,000 |
|
2 |
DG sets (42000 KVA) |
|
|
|
132,000,000 |
|
3 |
HT Panel |
|
|
|
5,000,000 |
|
4 |
LT Panel |
|
|
|
28,000,000 |
|
5 |
Cables |
|
|
|
25,000,000 |
|
6 |
Air conditioning |
Tonnes |
7,200 |
55,000 |
396,000,000 |
|
7 |
Wiring and fitting (15% of Building Cost) |
|
|
461,732,500 |
219,259,875 |
|
SUB TOTAL |
830,259,875 |
|
TOTAL |
3,375,092,375 |
|
|
|
1 |
Extra for special finishes [at] 10% on total cost |
|
|
|
337,509,238 |
|
2 |
Contingencies [at] 5% on Total cost |
|
|
|
168,754,618 |
|
GRAND TOTAL |
3,881,356,231 |
|